CONTEXT

STRUCTURE
This project focuses on the Column-Beam Connection within the larger post-and-beam frame structure. While seemingly simple, these connections require intricate detailing to seamlessly resolve multi-element node connections. Our design involved integrating two perpendicular columns into a monolithic L-shaped column, securing two additional beams in the process.
Through digital modelling, we adopted a multilayered laminated timber approach, minimising wastage and eliminating the need for adhesives. Strategic dowel placement ensured a robust connection without compromise.


PROCESS

DETAIL

FINAL ASSEMBLY
COMPONENT IN-PLACE